· Prepare Transmittal for shop Drawing, Material ,Method Statement, Fat, Pre-qualification etc. provided by Subcontractor.
· Record and Update the status of submittal (Registry).
- Registering of internal and external documents.
- Maintain document control registers / documents for incoming and outgoing project documents.
- Ensure that the latest revision and approval status of drawings is kept updated continuously.
- Ensure all hard and electronic copy distribution of controlled documents to focal point.
- Maintain documents for transmittal process for project documents.
- Follow procedures and update document control procedures when necessary